Installing a 500kg Gantry crane in a Stevenage factory

It was a local job for the Hooka crane team this week, working alongside Steve at Sontec Electrical Services, installing a 500kg Gantry crane in a Stevenage factory. With over £250K worth of machinery already installed nearby, the Hooka’s ability to transport the two crane sections carefully into site and then erect them safely in close proximity to the existing equipment was essential to eliminate the risk of any collateral damage! First stage was to transport and erect the 350kg primary support column and hold it secure during the chem-fix process. Then it was a case of rigging the Cranes ‘swing arm’ perfectly level, using the Hooka’s Spreader beam, to ensure an accurate alignment of the two sections – for the linking shaft to be inserted and join them together.

Whatever your steel beam installation needs, we'll take the strain with the unique Hooka mini tracked crawler crane handler hire!

The safest, easiest and fastest way to move and install all steel beams up to 2.4 tonnes

Hooka Steel Beam Lifter Mini Tracked Crawler Handler - Heavy Steel Beam Installation Service
Hooka Steel Beam Lifter Mini Tracked Crawler Handler - Steel Beams Installation
Hooka Steel Beam Lifter Mini Tracked Crawler Handler - 1300kg Steel Beam Installation
Hooka Steel Beam Lifter Mini Tracked Crawler Handler - Steel Beams Installation