Karl at Simcross Welding Services kindly called us in to install 2 steels into a large extension in Watford last week.
The two huge steels, weighing 900kg and 1200kg respectively, had to be tracked right through the centre of the existing property before being lifted up onto padstones.
Hooka’s ability to squeeze through the smallest of gaps enabled it to tow the beams in, with help from its powered tracked dolly, before 2 machines were used to lift the beams into place.
Another safe installation completed where other handlers could not reach. Thank you for the business!