Steel Beam Lifter
Check out our YouTube channel Check out our Facebook page Check out our Instagram Check out our Linked In posts
CONTACT US
  • Home
  • Specification
  • Key Facts
  • Recent Projects
  • Partners and Resources
  • Contact Us

1000kg Steel I-Beam Installation in St Albans

CGS hired the Hooka machine to transport pile packs weighing 1000kg through a restricted site in St Albans, then unload, destack and install them. The beams were 8m long and their normal method to transport them was not possible due the the narrowness of the site.

1000kg-Steel-Beam-Installation-in-St-Albans1
1000kg-Steel-Beam-Installation-in-St-Albans2
1000kg-Steel-Beam-Installation-in-St-Albans3

 

Tags: civilengineer, civilengineering, civilworks, piling, pilingmachine, pilingrig, pilingrigs, pilingworks, structuralengineering
Previous Post: Large Steel Frame Installation for Dance Building and Roofing Next Post: I Beam Picture Frame Installation in Ware

Recent Installations

  • Steel Beam Installation in Wolverhampton
  • Tight Space Steel Beam Installation in Guildford
  • Installing a Long Steel Beam in Caterham
  • Installing Steel Beams in a Restricted Access Space in South London
  • Steel Beam Installed in Farnham

© 2021 Hook-up Solutions Ltd, All rights reserved

Privacy Policy

Direct Response Web Design by Futuresys Digital

The Hooka, Ultimate Lift & Carry Carawler